Rigger III SAR 13/hour
Infinity International Technocrats Company (IITC) has announced an urgent requirement for 30 Rigger Level III workers holding TÜV certification for a long-term L&T project in Jafurah, Saudi Arabia. The offered rate is SAR 13 per hour, and an interview is scheduled for 06 September 2026 at 4:00 AM. Candidates who have the required rigging experience and valid TÜV documentation should prepare their documents and original passport for submission at the company office. IITC operates in manpower supply and industrial support services across Saudi Arabia, including the supply of skilled personnel for construction and industrial projects.
Responsibilities of a Rigger Level III
The selected Rigger III workers will support lifting and material-handling operations on the Jafurah L&T project. Their duties may include preparing loads for lifting, selecting and checking appropriate rigging equipment, attaching and securing loads, guiding lifting operations, and communicating with crane or equipment operators using established signals. Rigging activities must be performed according to approved lifting procedures and site safety requirements.
Rigger III personnel are expected to understand load-handling practices and recognize potential hazards before and during lifting operations. Candidates should be comfortable working around heavy equipment and industrial construction activities and should follow instructions from lifting supervisors and other authorized personnel.
TÜV Certification and Documents Required
The recruitment specifically requires Rigger III candidates with TÜV certification. Applicants should therefore have their valid TÜV certificate available for verification. The vacancy states that normal documents are required, and candidates are instructed to submit all documents together with their original passport to the office.
Candidates should ensure that their documents are genuine, complete, and ready before attending the interview. Those selected for the project should also confirm the exact mobilization procedure and any additional project documentation required by the L&T site before joining.
Jafurah Vacancy Details and Interview Schedule
Recruitment Overview
| Item | Details |
|---|---|
| Company | IITC – Infinity International Technocrats Company |
| Position | Rigger III (TUV) |
| Vacancies | 30 |
| Rate | SAR 13/hour |
| Project | L&T |
| Location | Jafurah |
| Duration | Long term |
| Interview | 06 September 2026, 4:00 AM |
| Payment | 45 days after timesheet |
| Food | Provided |
| Accommodation | Provided |
| Transportation | Provided |
| Documents | Normal |
| Passport | Original required |
Office Submission
Office: Ali Fouad Albannawi General Contracting Co. (AFCO), Al Merqab District, Al Jubail
Map: Office Location on Google Maps
IITC Office Contacts
Mobile / WhatsApp:
+966 545 822 963
+966 53 798 7367
Applicants should contact the recruitment team to confirm the interview arrangements and ensure they have all required documents and their original passport before reporting.
Final Instructions Before Mobilization
Candidates interested in this Rigger III TUV opportunity should verify the interview schedule, project conditions, rate, payment terms, and mobilization procedure directly with the recruitment team. Applicants should visit the office personally as instructed and submit genuine documents only. If Ajeer or Chamber registration is required for the particular project, candidates should ensure that the appropriate registration is completed before starting work, as proper documentation is important for protecting employment and payment arrangements.
Job seekers should remain cautious about recruitment fraud. Do not pay anyone for job selection, guaranteed employment, certificate approval, or mobilization without verifying a legitimate recruitment process. Keep copies of all submitted documents and do not surrender original personal documents unnecessarily. Candidates who meet the Rigger III TÜV requirements should prepare for the early-morning interview and contact IITC promptly for final reporting instructions.